Nutzen Sie Bombay Durpun mit personalisierter Werbung, Werbetracking, Nutzungsanalyse und externen Multimedia-Inhalten. Details zu Cookies und Verarbeitungszwecken sowie zu Ihrer jederzeitigen Widerrufsmöglichkeit finden Sie unten, im Cookie-Manager sowie in unserer Datenschutzerklärung.
Use Bombay Durpun with personalised advertising, ad tracking, usage analysis and external multimedia content. Details on cookies and processing purposes as well as your revocation option at any time can be found below, in the cookie manager as well as in our privacy policy.
Utilizar Bombay Durpun con publicidad personalizada, seguimiento de anuncios, análisis de uso y contenido multimedia externo. Los detalles sobre las cookies y los propósitos de procesamiento, así como su opción de revocación en cualquier momento, se pueden encontrar a continuación, en el gestor de cookies, así como en nuestra política de privacidad.
Utilisez le Bombay Durpun avec des publicités personnalisées, un suivi publicitaire, une analyse de l'utilisation et des contenus multimédias externes. Vous trouverez des détails sur les cookies et les objectifs de traitement ainsi que sur votre possibilité de révocation à tout moment ci-dessous, dans le gestionnaire de cookies ainsi que dans notre déclaration de protection des données.
Utilizzare Bombay Durpun con pubblicità personalizzata, tracciamento degli annunci, analisi dell'utilizzo e contenuti multimediali esterni. I dettagli sui cookie e sulle finalità di elaborazione, nonché la possibilità di revocarli in qualsiasi momento, sono riportati di seguito nel Cookie Manager e nella nostra Informativa sulla privacy.
Utilizar o Bombay Durpun com publicidade personalizada, rastreio de anúncios, análise de utilização e conteúdo multimédia externo. Detalhes sobre cookies e fins de processamento, bem como a sua opção de revogação em qualquer altura, podem ser encontrados abaixo, no Gestor de Cookies, bem como na nossa Política de Privacidade.
NASA called off the test flight on Monday of its largest-ever Moon rocket because of a temperature issue with one of the four giant engines.
Text size:
"The launch director has called a scrub for the day," the US space agency said.
Alternative dates for launch of the Artemis 1 mission, an uncrewed flight around the Moon as part of an ambitious program to eventually go to Mars, are Friday and next Monday.
Blastoff had been planned for 8:33 am (1233 GMT) but was put on hold because of a temperature problem with one of the four engines on the 322-foot (98-meter) Space Launch System (SLS) rocket.
Tens of thousands of people -- including US Vice President Kamala Harris -- had gathered near the Kennedy Space Center in Florida to watch the launch, which comes 50 years after Apollo 17 astronauts last set foot on the Moon.
The goal of the flight is to test the SLS and Orion crew capsule that sits atop the rocket. Mannequins equipped with sensors are standing in for a crew for the mission.
Overnight operations to fill the orange-and-white rocket with more than three million liters of ultra-cold liquid hydrogen and oxygen were briefly delayed by a high risk of lightning.
Around 3:00 am, another hiccup emerged: a potential leak was detected during the filling of the main stage with hydrogen, causing a pause. After tests, the flow resumed.
But NASA engineers later detected a problem with the temperature in one of the four RS-25 engines and put a hold on the countdown before eventually scrubbing the launch.
The rocket's Orion capsule is to orbit the Moon to see if the vessel is safe for people in the near future. At some point, Artemis aims to put a woman and a person of color on the Moon for the first time.
"This mission goes with a lot of hopes and dreams of a lot of people," NASA Administrator Bill Nelson said.
- Extreme temperatures -
During the 42-day trip, the Orion capsule will orbit the Moon, coming within 60 miles (100 kilometers) at its closest approach, and then fire its engines to shoot out 40,000 miles -- a record for a spacecraft rated to carry humans.
One of the mission's primary objectives is to test the capsule's heat shield, which at 16 feet in diameter is the largest ever built.
On its return to Earth's atmosphere, the heat shield will have to withstand a speed of 25,000 miles per hour and a temperature of 5,000 degrees Fahrenheit (2,760 degrees Celsius) -- roughly half as hot as the Sun.
The dummies aboard the spacecraft will record acceleration, vibration and radiation levels.
The craft will deploy small satellites to study the lunar surface.
A complete failure would be devastating for a program costing $4.1 billion per launch that is already years behind schedule.
- Life on the Moon -
The next mission, Artemis 2, will take astronauts into orbit around the Moon without landing on its surface. The crew of Artemis 3 is to land on the Moon in 2025 at the earliest.
The Artemis program is to establish a lasting human presence on the Moon with an orbiting space station known as Gateway and a base on the surface.
Gateway would serve as a staging and refueling station for a voyage to Mars that would take a minimum of several months.